Evaluation

What an evaluation commits you to.

This is the commercial half: how an engagement actually runs, what sets its pace, what it costs, what happens when it works, and how licensing begins. The technical half — what you bring, what it needs to run, the smallest working configuration and what to measure — is on the engineering site, written for the engineer who has to make it work.

No procurement to reach a pilotTerms agreed per engagement
01 · Briefing

Forty-five to sixty minutes, and no obligation at the end of it.

Bring your path inventory, the failure moment you need to prevent, your traffic priorities and your platform constraints. Bring the operational owner, a platform or systems engineer, and a security advisor where one is relevant — the conversation is worth more with all three present than repeated three times.

You leave with a concise problem map, an honest fit assessment and a proposed demonstration or pilot boundary. If Atlas does not fit your problem, that is the useful outcome of the briefing and we will say so in it.

02 · Demonstration

Controlled failure, against criteria you set beforehand.

We reproduce link loss and degradation against agreed success criteria — the dashboard, a link killed with video still running, the hosted console, the terrain simulator where it is relevant. The criteria are agreed before the demonstration, so the result is a measurement rather than a performance.

Remote or on site, on our equipment or in a representative setup of yours. What ends the step is a decision about whether the behaviour you saw addresses the failure moment you described.

03 · Pilot

Your compute, your links, your traffic — and no procurement to get there.

A software-only pilot runs on compatible compute and communication paths you already operate. No dedicated Atlas networking appliance is required to establish the product case, so a pilot does not have to wait behind a hardware purchase or a capital cycle.

Scope is agreed in writing before it starts: which nodes, which links, which traffic, how long, what counts as success and who measures it. That agreement is the point of the pilot — an unbounded trial produces opinions, not evidence.

04 · Integration

Where the commercial relationship actually begins.

Interfaces, security boundaries, ownership, support and lifecycle responsibilities are defined here, alongside licensing. This is the first step with money in it, and the first with an executed agreement behind it.

Specifications, acceptance criteria, support and availability commitments exist only in that agreement — never in a slide, a web page or this one. The legal boundary, stated plainly

How long it takes

Set by your platform, not by our calendar.

A pilot length fixed on a website is a number chosen before anyone has seen your platform. The shape below is what these engagements typically look like; the actual calendar is agreed in the conversation that opens each step.

The briefing is 45–60 minutes. After that, a shape rather than a promise.An off-the-shelf evaluation on your own bench typically runs 30–90 days. A full assessment that ends in a written outcome report runs three to six months, because it is paced by your platform, your review gates and your acceptance criteria — not by ours.
01

Your platform sets the pace

A pilot moves at the speed of the vehicle, aircraft, vessel or site it runs on. Access windows, maintenance cycles and flight or duty schedules decide more of the calendar than we do.

02

Your review sets the gates

Security review, safety sign-off and change control are real steps with real queues. If one of them gates your programme, say so in the briefing.

Security & compliance
03

Your criteria set the end

A pilot ends when the agreed evidence exists, not when a period expires. Deciding what that evidence is — in the briefing — is what keeps the pilot from running indefinitely.

What evidence looks like
What it costs

The first steps cost attention, not budget.

You can reach a decision about whether Atlas addresses your failure moment without raising a purchase order. What the early steps cost you is time and access — the part nobody can pay on your behalf.

01 · OUR SIDE

No charge, no obligation

The briefing and the demonstration carry neither. If the answer is that Atlas does not fit your problem, that answer costs you nothing and you have it early.

02 · YOUR SIDE

Compute, links and people

You supply compatible compute you already own, the communication paths you already operate and the time of the people who know your network. There is nothing to procure to reach a pilot.

03 · A PILOT

Scoped before it is priced

A pilot has a commercial shape as well as a technical one — an evaluation licence, integration work, on-site engineering or travel, depending on what it has to prove. Whatever it needs is scoped and agreed before it starts, and never discovered afterwards.

There is no price list, and that is deliberate. A subscription is sized to the deployment, so a figure quoted before the path inventory, the node count and the operating conditions are known would be a guess dressed as a quotation. Price follows scope, and scope comes out of the briefing.
If it works

Nothing has to be dismantled to go into service.

The pilot runs the same software on the same compute as the deployment. What changes around it is the agreement and a signed licence file — not the binary, not the architecture and not the hardware you already bought.

If it does not

You keep the measurements.

The path inventory, the failure analysis and the numbers from the pilot describe your network, not our product. They remain useful whatever you decide — including deciding against us. We would rather lose at the pilot than at your acceptance test.

Support

Defined at integration, in the agreement.

Support, lifecycle responsibilities, ownership of interfaces and the security boundary are settled in the integration step and written into the executed agreement. Availability and acceptance commitments live there and nowhere else.

Expansion

Widen the estate, not the contract every time.

Most programmes start with one bounded network — a vehicle type, a site, a fleet segment — and widen once the model is proven. The licence is sized to what you actually run, so growing the estate is a change of scale rather than a new evaluation.

Subscription

Sized to the deployment.

Licensing follows the segment — sites for infrastructure, operator seats or airframes for uncrewed fleets — agreed per engagement, not metered per gigabyte. Nothing about the model charges you for the traffic that resilience exists to protect.

Ephemeral nodes

You license the persistent estate.

Nodes you intend to keep are licensed. Expendable and disposable ones — one-way airframes, throwaway relays, a node stood up for one operation and never seen again — are free. Counting them would be absurd, so we don’t.

Offline licensing

Signed offline license files.

No activation server, no licence phone-home — the licensing mechanics obey the same air-gap posture as the software itself. An air-gapped network stays licensed without ever reaching the internet, because there is nothing for it to reach.

Never a kill switch

The software never stops passing traffic on expiry.

An expired subscription warns and suspends updates and support. It does not, under any circumstances, interrupt a running communications system. A commercial lapse is a commercial problem; it is never allowed to become an operational one.

The agreement

Proprietary software, licensed in writing.

Nexus Atlas is proprietary; it is not an open-source product. Commercial use runs under a master licence and subscription agreement between two named parties, with the licensed metric for that deployment carried on the order form. No page on this site grants a licence to anything — the term, the scope and every commitment live in the executed agreement.

Source audit and escrow are available to sovereign customers, for the procurement processes that require them.

Security, compliance and supply chain
The other half

Your engineers have a different set of questions.

What to install and where, what it needs to run, the smallest configuration that proves anything, and what to measure while it runs — the technical half of the same evaluation is written for them on the engineering site, alongside the architecture and protocol detail. CGNAT traversal and relay infrastructure are explained on nexusatlas.net.

Request a briefing

Start with the briefing. Everything else follows from it.

Forty-five minutes to map the links, the failure moment and the evidence a useful pilot must produce — and to agree what the next step involves, if anything.